PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Compacted area (underground Piping) Facing North-West (800x600).jpg Continued wiring the electrical panel Facing East (800x600).jpg Installing beam at Stair -4 (2nd Floor) Facing South (800x600).jpg Installing rebar mats at Elev. 5,6 Facing North-West (800x600).jpg Installing water test on the water and fire service pipes Facing South (800x600).jpg Verizon working on removing and transferring the lines at Rahway Avenue Facing South-East (800x600).jpg
Previous pageNext page Installing water test on the water and fire service pipes Facing South (800x600)
Installing water test on the water and fire service pipes Facing South (800x600)